top of page

Construction Systems

This project gave students the opportunity to learn about typical construction systems. Floor plans were unique to each student but all plans included the need for hot and cold water connections, electrical connections, and a HVAC system. These physical models were built individually with materials that needed to be properly sized to scale.

Second Year

Construction Modeling

December 2022

ID2774_F2022_Project#2_Photograph_ZVICARI_ 12-7-2022_MEdmonds.jpg
bottom of page